第2回
原子力発電施設における安全系機器待機除外時のリスク評価について
著者:
五十嵐 祐介,Yusuke IGARASHI,森 智美,Tomomi MORI,浅野 淳也,Junya ASANO,森田 毅,Takeshi MORITA,山中 勝,Masaru YAMANAKA,鴨志田 哲雄,Tetsuo KAMOSHIDA,福山 智,Satoru FUKUYAMA
発刊日:
公開日:
キーワードタグ:
On-line Maintenance Outage Time PSA Risk Informed Acceptable Outage Time
五十嵐 祐介,Yusuke IGARASHI,森 智美,Tomomi MORI,浅野 淳也,Junya ASANO,森田 毅,Takeshi MORITA,山中 勝,Masaru YAMANAKA,鴨志田 哲雄,Tetsuo KAMOSHIDA,福山 智,Satoru FUKUYAMA
発刊日:
公開日:
キーワードタグ:
On-line Maintenance Outage Time PSA Risk Informed Acceptable Outage Time
This study provides an application of the risk evaluation of a nuclear power plant to the improvement of the plant operation and maintenance activities. The risk p rofiles for assumption of not only single but also double outage of safety systems, obtained from the risk importance analysis, show that the risk increase from si ngle outage of the supporting systems is generally higher than that of the frontline systems, and that the risk increase from double system outage depends on the combination of the o...
英字タイトル:
Study on the Risk Evaluation for Safety Systems Outage at Nuclear Power Plant
英字タイトル:
Study on the Risk Evaluation for Safety Systems Outage at Nuclear Power Plant
第14回
運転中の大容量共用施設における計測制御設備の更新工事
著者:
橋本 渉,Wataru HASHIMOTO,加賀 康文,Yasufumi KAGA,紺野 准也,Junya KONNO,草野 昌紀,Masanori KUSANO,岸本 裕樹,Hiroki KISHIMOTO
発刊日:
公開日:
キーワードタグ:
Failure mode and effects analysis instrumentation and control system Replacement Risk reduction measures
橋本 渉,Wataru HASHIMOTO,加賀 康文,Yasufumi KAGA,紺野 准也,Junya KONNO,草野 昌紀,Masanori KUSANO,岸本 裕樹,Hiroki KISHIMOTO
発刊日:
公開日:
キーワードタグ:
Failure mode and effects analysis instrumentation and control system Replacement Risk reduction measures
At the case of the replacement of instrumentation and/or control system for the common and large capacity facilities such as a compressed service air supply system, it is very important to proceed this work in short period and without any influence to the operation of many number of this users. In order to realize this fundamental requirement, enough consideration, evaluation ,and countermeasures to the risk by FMEA have been executed since planning stage. By means of these activities, a stable operation...
英字タイトル:
Achievement of the replacement of the instrumentation and control system during continuous operation of the common and large capacity facilities
英字タイトル:
Achievement of the replacement of the instrumentation and control system during continuous operation of the common and large capacity facilities